by administrator | Mar 6, 2015 | Mini Piling, Underpinning
Morcon were contracted by the Gelder Group to carry out a third phase of underpinning to a property in Hulland that has suffered settlement of filled ground leading to damage to the house and garage. We pre-drilled through the filled ground to ensure that the driven...
by administrator | Mar 6, 2015 | Mini Piling
Project Description Morcon were contracted to install a piled raft for a new garage to a property in Derby. The site was prepared by the main contractor, Carter Construction Limited (Derby), in preparation for our works. Piles were driven to refusal; shuttering...
by administrator | Mar 6, 2015 | Lifting and stabilising, Mini Piling
Project Description Morcon were contracted, by EJ Taylor and Sons Ltd, to carry out the installation of a piled raft stabilisation scheme to a block of flats suffering from the effects of clay heave. The building had previously been underpinned using the traditional...
by administrator | Mar 6, 2015 | Lifting and stabilising, Mini Piling, Pressure grouting
Project Description Approximately 20 properties were suffering with floor slabs that had sunk between 5mm and 35mm. In response to various site investigations Morcon were asked to design a scheme to consolidate the filled ground, lift the slabs to their original...
by administrator | Mar 5, 2015 | Mini Piling
Project Description We were asked by the property owner, a Structural Engineer, to construct an internal piled raft slab to accommodate the proposed installation of a steel framed construction which would act as a support for the existing external walls and roof. We...