by administrator | Mar 6, 2015 | Foundation Construction
Project Description This project was a new foundation for an extension to a domestic dwelling in the beautiful setting of Broadway in the Cotswolds. This could have been a very tricky project to carry out due to the levels of the site necessitating the need for the...
by administrator | Mar 6, 2015 | Mini Piling, Underpinning
Morcon were contracted by the Gelder Group to carry out a third phase of underpinning to a property in Hulland that has suffered settlement of filled ground leading to damage to the house and garage. We pre-drilled through the filled ground to ensure that the driven...
by administrator | Mar 6, 2015 | Mini Piling
Project Description Morcon were contracted to install a piled raft for a new garage to a property in Derby. The site was prepared by the main contractor, Carter Construction Limited (Derby), in preparation for our works. Piles were driven to refusal; shuttering...
by administrator | Mar 6, 2015 | Foundation Construction, Underpinning
Project Description Morcon were contracted to underpin part of an existing farmhouse and to extend the foundation so that the property could be extended. Parts of the original farmhouse were kept original due to the property being in a conservation area. 200mm...
by administrator | Mar 6, 2015 | Lifting and stabilising, Mini Piling
Project Description Morcon were contracted, by EJ Taylor and Sons Ltd, to carry out the installation of a piled raft stabilisation scheme to a block of flats suffering from the effects of clay heave. The building had previously been underpinned using the traditional...